Oil & Gas Plant

E : Engineering / P : Procurement / C : Construction
No. NAME PERIOD REMARK
1 UGCC Water Treatment Project 2013.03~2014.05 E.P
2 UGCC WAO Project 2013.01~2014.05 E.P
3 THAI UAC PP(Gas Separation) Project 2012.07~2013.04 E.P.C.
4 QLC PX Revamp Project 2012.06~2013.11 E
5 HYUNDAI OIL BANK LNG Pipeline Project 2012.06 ~2012.09 C
6 LG TOYO B2B Pilot Plant Project 2012.05~2012.09 E.P.C.
7 HYUNDAI OIL BANK # 1 Alkylation Revamp Project 2012.08~2013.06 C
8 HYUNDAI OIL BANK Alkylation Revamping(Engineering) Project 2012.04~2013.06 E
9 LG CHEMICAL MS Letdown Facility Project 2012.03~2012.05 C
10 LG CHEMICAL Polishing Slurry Recycling Project 2012.03~2012.08 C
11 S-OIL Tail Gas Catalytic Incineration Project 2011.07~2012.01 E.P.C.
12 SAMSUNG ENGINEERING Eni Zubair DGS South Package Project 2011.07~2011.08 E
13 HYUNDAI OIL BANK BTX FEED Verification Project 2011.06~2011.12 E
14 THAI HMC PP Project 2011.04~2012.06 E.P. C.
15 LG CHEMICAL No.2 CA/EDC Project 2011.04~2012.12 E
16 GS CALTEX No.1 PX Revamp Project 2011.03~2011.12 E
17 QATAR Barzan Engineering Service Project 2010.09~2010.10 E
18 LG CHEMICAL PE Revamping Project 2010.09~2011.06 E.P.C.
19 LG CHEMICAL COLD BOX Project 2010.09-2010.11 E.P.C.
20 YEOCHUN NCC BTX#1 Sulfolane Unit Revamping Project 2010.09-2010.12 E
21 HYUNDAI OIL BANK HDO/ HCP Equipment Project 2010.04~2010.06 C
22 LG CHEMICAL BUTENE-1 Project 2008.12~2009.06 E.P.C.
23 LG CHEMICAL CAA Revamping Project 2008.09~2009.05 C
24 CPC Dearomatic Plant Engineering Service Project 2008.05~2009.05 E
25 LOTTE CHEMICAL NCC/BRU/BDR Intertray Project 2007.12~2008.06 C
26 SAMSUNG TOTAL HPEO Column Revamping Project 2007.08~2008.03 E.P.C.
27 LOTTE CHEMICAL Wet Air Oxidation Project 2007.07~2008.04 E.P.C.
28 LG CHEMICAL OS-BOG Unit Project 2007.06~2008.04 E.P.C.
29 SEETEC DAESAN Port Pipeline Project 2006.10~2007.12 C
30 TAEYOUNG Tank Terminal Project 2006.09~2007.02 E
31 HONAM HEG D.I Water SYSTEM Project 2003.09~2004.04 E.P.C.